Now I’m sure this has been covered somewhere on this forum, or somewhere on tealit but it’s late i’m tired and I can’t be fluffed to go through loads of old posts.
Anyway I signed a 1 year contract with a school in September which originally gave me the ARC, and the ARC said that it expire in September 2011 (when the contract ends at that school). I figure after a while of working at the school that it wasn’t what I wanted so I pretty much left in May and got a new job with another who offered me and arc and a one year contract. So I went off to process the ARC to get it changed to another school and get it all done and sorted and it went smoothly. However I then looked at the expiry date of my ARC and realised that it still states my expiry date as this September and not next May as my new school has offered me a contract till May.
What’s up with that? Is that meant to be or someone made a little mistake?